Fictional researchers inspect the same two prediction maps through a magnifying glass while discussing a change of denominator.
Three descriptions, one change. Original AI-generated comic; fictional dialogue.

Statistically Significant Nonsense · Episode 4

The lab, researchers, reviewer and dialogue are fictional. The satire targets methodological overclaiming, not the cited authors or any identifiable study. Numerical examples are illustrative calculations, not reported HSI results. References support the statistical arguments and their qualifications.

The denominator department is hiring

Our fictional HSI lab has completed the experiment. The predictions are fixed, the errors are fixed, and the only remaining trainable parameter is the headline. Fortunately, the denominator department has spare capacity. Its director promises to make the improvement much larger without touching a single spectral band.

An effect size describes a magnitude under a specified definition. Absolute accuracy difference, rare-target recall at a fixed false-alert budget, latency ratio and calibration-error change answer different questions. Putting them all into a column labelled improvement does not make them different dialects of the same operational benefit.

Specify the outcome, population, aggregation and direction first. Mean scene-level accuracy and pooled pixel accuracy weight scenes differently. Object recall counts entities rather than area. The quantity should match the intended decision before the director selects whichever unit requires the largest font.

Two points enter. Twenty per cent leaves.

Consider an illustrative accuracy change from 90% to 92%. The absolute gain is two percentage points. Relative accuracy rises by 2/90, approximately 2.22%. Error falls from 10% to 8%, a 20% relative error reduction. Every calculation is correct. They describe the same predictions with different denominators, which is why the director has placed three invoices on your desk.

For rare-target recall rising from 20% to 30%, the gain is ten percentage points or 50% relative. The larger number does not retrieve the remaining missed targets. They are still absent from the detection map, patiently waiting for the next round of denominator innovation.

Report the baseline, new value, denominator and unit together. Relative change can be informative; it becomes difficult to interpret when the starting point disappears. Avoid an unqualified percent improvement for bounded metrics, particularly near zero or one. A 20% error reduction and a two-point accuracy gain may be the same useful result. There is no need to invite readers to imagine two different experiments.

Alternative descriptions of the same illustrative accuracy change.
QuantityCalculationResult
Absolute accuracy gain92% − 90%2 percentage points
Relative accuracy gain(92 − 90)/902.22%
Relative error reduction(10 − 8)/1020%

Cohen’s d would like to know which denominator you hired

Standardised mean differences divide a mean difference by a specified standard deviation. This can help compare differently scaled measurements, but the chosen denominator matters. In paired designs, the standard deviation of within-pair differences is not the independent-groups pooled standard deviation. Both may wear a respectable statistical symbol. They are still different quantities.

Lakens explains common effect-size variants and why the precise definition should be reported. “We calculated Cohen’s d” can leave the important part of the calculation unidentified. For models that succeed and fail on the same scenes, the pairing can substantially affect the denominator. Give it a name and an equation, not a mysterious badge granting access to the results section. [1]

A tiny raw gain with very low variability can yield a large standardised effect. A useful raw gain across diverse scenes can yield a modest one. Neither label decides practical value. The denominator department is welcome to provide standardisation, provided it also returns the original measurement units.

Sources: [1]

Bias correction does not manufacture another flight campaign

Hedges studied the distribution and small-sample bias of standardised effect estimators and developed corrections under explicit models. A correction can improve estimator properties. It does not add observations, remove uncertainty or summon an airborne sensor from the methods section. State the estimator, degrees of freedom and correction actually used. [2]

With few independent HSI scenes, the corrected estimate can still have a wide interval. More seeds characterise optimisation variability on the available data; they do not supply more independent acquisition environments. Treating every seed–scene combination as independent turns a crossed experimental structure into a very enthusiastic attendance sheet.

Use an appropriate model or resampling design for that structure and report scene and seed counts separately. A clear raw difference with defensible uncertainty is more informative than an elaborate standardised statistic whose denominator cannot be located. The correction has an important statistical job. Recruiting imaginary scenes is outside its contract.

Sources: [2]

Please compare the models to each other

The lab proudly displays two means, each with an interval. The reviewer asks for the uncertainty of their difference. The director gestures between the bars, as though the empty space constitutes a third statistical analysis. It does not. When methods share evaluation scenes, covariance matters.

Calculate scene-wise paired differences and analyse them appropriately. Both methods may lose accuracy on difficult scenes, yielding substantial individual variability but fairly stable differences. Alternatively, one may gain in one environment and lose in another. A paired scatterplot or difference plot can expose what two isolated averages politely conceal.

Cumming advocates estimation with effect sizes and intervals in a cumulative quantitative approach. Here, the practical repair is to publish comparative effects and a justified interval, with a clear account of the independent units. Define what ± means. That symbol should not be allowed to represent standard deviation, standard error and confidence limits depending on which interpretation improves the meeting. [3]

Sources: [3]

Does the extra accuracy pay for anything?

A smallest effect of interest needs an application-based justification: decision costs, measurement precision or an operational consequence. Generic small, medium and large labels do not tell an ecologist whether another detected tree matters or an engineer whether the extra inference delay breaks a deployment requirement. The adjectives have no access to the project budget.

For target search, compare recall at a fixed false-alert budget and translate it into additional objects found per scene. For a resource-constrained model, measure quality jointly with memory, latency and energy under matched hardware and workload. A statistically tidy gain can bring an inconveniently untidy GPU bill.

The ASA statement distinguishes statistical significance from magnitude and scientific importance. A precise negligible gain can have a small p-value. A potentially valuable gain with a wide interval remains uncertain, not irrelevant. Practical significance is an argument about consequences, not another threshold the denominator department can install beside the coffee machine. [4]

Sources: [4]

The average is representing several unhappy constituents

Mean improvement can conceal different behaviour across sensors, classes and object sizes. A large vegetation area may dominate pooled accuracy while tiny targets deteriorate. An average class score can conceal gains concentrated in well-represented categories. In our fictional meeting, the director presents the average as unanimous approval. The small vehicles would like the minutes corrected.

Demšar’s dataset-comparison framework helps distinguish overall ranking from per-dataset behaviour. Ranks convey ordering and some consistency, while discarding the magnitude of score differences. Show the raw differences alongside benchmark summaries so readers can assess whether the apparent lead has practical substance. [5]

Examine prespecified strata relevant to the claim. If a favourable subgroup emerges after inspection, disclose that selection and address multiplicity for formal claims. Do not promote the one cooperative sensor into a universal deployment environment. Negative or uncertain performance in a difficult stratum helps define where the method belongs.

Sources: [5]

The confidence interval refuses to write your conclusion

Suppose a hypothetical gain is 0.4 percentage points with a valid interval from −0.1 to 0.9. If deployment requires at least one point to justify its costs, this offers little support for the desired gain. If 0.2 points would matter, the same interval leaves both useful gains and small losses plausible. The numbers did not change; the decision requirement did.

An interval crossing zero does not make all values inside equally plausible. A frequentist confidence interval is not automatically a posterior probability statement either. Interpret its construction and assumptions. For equivalence or noninferiority, use a justified prespecified margin and the corresponding procedure; do not rename a broad interval “basically identical” because the deadline has arrived.

Check defensible choices of aggregation, reference quality and scene inclusion. If the apparent effect changes materially across those choices, show that instability. Selecting the most flattering estimate after the sensitivity analysis converts a diagnostic into a second denominator department, this time with a longer appendix.

Return the predictions with the invoice

A useful report gives the baseline and new values, raw difference, optional standardised effect, uncertainty method, independent units and practical threshold. Preserve scene-level outputs, metric definitions and weighting so the estimate can be reconstructed. Add relevant failures and computational conditions. The headline is now welcome to describe what actually happened.

Keep the measured effect separate from its proposed mechanism. An improvement after adding a hypergraph component does not alone establish that higher-order modelling delivered the intended scientific explanation. That needs suitable ablations and controls. An architecture diagram is not a causal-identification argument, however beautifully the arrows curve.

Tell readers what changed, by how much, under which conditions and with what uncertainty. Relative error reduction, standardised effects and p-values can all contribute when their meanings are explicit. The denominator department may remain open. It just has to put the original numbers on the receipt.

Frequently asked questions

Should every AI comparison report Cohen’s d?

No. Report the raw effect in task-relevant units first. Use a standardised effect only when its denominator, design and interpretation help answer the research question.

Is relative error reduction misleading?

It can be useful, but report the original and final error rates alongside it. A large relative reduction may correspond to a small absolute change.

Can a statistically significant gain be too small to matter?

Yes. Statistical compatibility and practical value are different assessments. The latter requires a justified threshold or decision context.

References and further reading

  1. Lakens (2013): Calculating and reporting effect sizes to facilitate cumulative science
  2. Hedges (1981): Distribution Theory for Glass’s Estimator of Effect Size and Related Estimators
  3. Cumming (2014): The New Statistics: Why and How
  4. Wasserstein and Lazar (2016): The ASA Statement on p-Values: Context, Process, and Purpose
  5. Demšar (2006): Statistical Comparisons of Classifiers over Multiple Data Sets

Reader feedback

— reads— comments

Reads since 1 October 2026: at least 15 seconds with the article visible, counted once per browser per day. Reactions are anonymous and can be changed.

Discuss this article

Ask a technical question, challenge an assumption or share evidence from your own work.

Your name and comment will be public after approval. New comments wait for approval. No email required. Keep it respectful and relevant; no personal information or spam. Plain text, up to 2,000 characters.

Owner: manage comments